סמארט וויסט (לשעבר זירו וויסט) Smart Waste

Smart Waste - Waste management facility

Key information

Facility Type

Municipal waste sorting and recycling facility

Location

The Shapadan complex, Rishon Lezion

Commercial Launch Date

Under Construction

The Cconcession Period

25 years (BOT)

Retention Rate

50% through BlueGen

Maximum Treatment Capacity Per Year

About 406 thousand tons of waste (and another 73 thousand tons of waste - sorting only)

Sector

Environment

Sub-Sector

Waste treatment

key info image bg pattern סמארט וויסט (לשעבר זירו וויסט)
figure pattern

Important to know

First facility of its kind for sorting and recycling municipal waste

Using anaerobic digestion technology to produce clean electricity from biogas and composting to produce fertilizer for agriculture

A safety net from the state to guarantee the facility's income

The first facility of its kind in Israel for the treatment of municipal waste through the use of innovative and advanced technologies for waste recycling and treatment. The facility, whose construction began in early 2023, is expected to be the largest in Israel and among the largest of its kind in the world. It will provide a response to local authorities in the Tel Aviv district and the center, which are responsible for producing about half of the amount of waste in Israel. In view of the fact that the facility is expected to recycle approximately 60% of the waste received, it will dramatically reduce the amount of waste landfilled in Israel.

The facility is expected to provide a complete end-to-end solution for the waste absorbed in it, based on three main stages: absorption and sorting, anaerobic digestion and composting. During its operation, the facility is expected to generate income mainly from absorption fees, for waste received at the factory gate, from the sale of recycling products and from the sale of electricity that will be produced in the facility using the biogas method.

More about Smart Waste on BlueGen's website