Facility type |
Desalination facility |
|
Location |
Ashdod Northern Industrial Zone |
|
Operation date |
2015 |
|
Concession period |
27 years (BOT) |
|
Holdings rate |
50% via BlueGen |
|
Maximum annual production capacity |
140 MCM |
|
Sector |
Environment |
|
Sub-Sector |
Water and Wastewater |
The facility recently completed an extensive refurbishment and modification of the desalination process
In process - construction of a power station of up to 100 MW in the facility site, expected to reduce the production costs significantly
The facility was established by virtue of a BOT concession for seawater desalination, with a maximum annual generation capacity of 140 MCM. Location: Ashdod Northern Industrial Zone. The water desalinated in the facility is sold to the Desalination Administrative Division, through a mechanism which includes payment for both the availability and the actual consumption.
Facility upgrade works were completed during 2025, improving energy and chemicals consumption. A power plant station is being built on site, expected to start its operation in the second half of 2026. The concession period was extended to 2044.
More on Desalination Ashdod website